TILOS time-location planning software for managing linear construction projects, especially infrastructure projects

integrated project using tilos
  • Cost efficiency, reduced planning time with improved schedule clarity
  • Open Data Exchange, exchange data with other project management systems like Primavera P6 and Microsoft Projects
  • Integrated Project Planning solutions
  • Professional presentations, present high quality plans
  • Effective communication, visualize the connections between location and construction performance
Free trial

TILOS for construction and civil engineering

Visualize your schedule both in time and distance

TILOS can be used in many construction applications such as Highway, Railway, Pipeline, and Tunnel Construction, but also Water Engineering or Transmission Line Building.

Scheduling made easy

The application visualizes project schedules in both time and distance. The time schedule is hereby combined with the location which relates to the project at that moment. In this way, project planners provide insight and logic in the activities planned at the same location and at the same time. Conflicts between mutual activities can be detected and eliminated in time this way.

Scheduling made more clear

If the project has a linear structure (road building, construction of tunnels, bridges and pipeline construction), the chart clearly shows the connection between geometry and construction.

Integrated project planning solution

You make the schedule while Tilos calculates the deadlines and the total time frame, with the push of a button. Besides, Tilos delivers you a complete network planning technology, including costs and resource planning in one integrated system.

Minimum technical requirements

Dual Core CPU, 2×2000 MHz, 1 GB RAM (or more)
Screen Resolution
QVGA   1280×960 (4:3)
WXGA  1280×800 (16:10)

Recommended:

Quad Core CPU, 4 x 2Ghz, 4GB RAM (or more)
Full HD 1920×1080 (16:10)

Operating system requirements

TILOS is tested with the following operating systems:

  • Windows XP Professional
  • Windows VISTA Business (32 bit/ 64 bit)
  • Windows 7 Professional (32 bit/ 64 bit)
  • Windows 8 Pro (32 bit/ 64 bit)
  • Windows 10 Pro (32 bit/ 64 bit)
Server requirements

Server (fileserver):

  • Windows 2000 Server
  • Windows 2003 Server
  • Windows 2008 Server (64 bit)
  • Windows 2012 Server (64 bit)
  • Most SAN or NAS equipment
A clear view of your planning versus location

The software is developed to improve the visualization of repetitive tasks in which the location (distances) plays a central role. The main advantage is the visual clarity of the data streams. The use of resources and equipment can be disposed when implementing the project at the location. Bar charts and network diagrams are informative and provide organizations with their basic needs. However, these views are often just analytically and give no visual understanding of your actual situation.

Create a realistic representation of your scope

Time-distance diagrams provide a practical picture of the scope by location-based project details and the schedule at a glance. Tilos is able to visualize a complete analysis of your critical path in a time-distance diagram. The application offers full support of your sub-projects such as bridges or stations, which can be planned in a separate sub-project. Milestones in this sub-project can be integrated with your integrated time-distance diagram. With Tilos you have complete control over quantities, work rates, resources and costs. The software provides a perfect visualization and monitoring of your progress.

A simplified way of planning

Tilos makes it possible to refer to individual activities and task. Progress can be measured by task whereby a detailed view of the project progress can be given. The software with its pre-defined work packages is designed for quickly creating linear schedules. When creating new activities Tilos analyzes location related data (distances) and through this it defines the quantity, resource allocation and the duration. In this way, scheduling is simplified and it minimizes the work for the planner to be performed.

A clear view of your planning versus location

The software is developed to improve the visualization of repetitive tasks in which the location (distances) plays a central role. The main advantage is the visual clarity of the data streams. The use of resources and equipment can be disposed when implementing the project at the location. Bar charts and network diagrams are informative and provide organizations with their basic needs. However, these views are often just analytically and give no visual understanding of your actual situation.

Create a realistic representation of your scope

Create a realistic representation of your scope

Time-distance diagrams provide a practical picture of the scope by location-based project details and the schedule at a glance. Tilos is able to visualize a complete analysis of your critical path in a time-distance diagram. The application offers full support of your sub-projects such as bridges or stations, which can be planned in a separate sub-project. Milestones in this sub-project can be integrated with your integrated time-distance diagram. With Tilos you have complete control over quantities, work rates, resources and costs. The software provides a perfect visualization and monitoring of your progress.

A simplified way of planning

Tilos makes it possible to refer to individual activities and task. Progress can be measured by task whereby a detailed view of the project progress can be given. The software with its pre-defined work packages is designed for quickly creating linear schedules. When creating new activities Tilos analyzes location related data (distances) and through this it defines the quantity, resource allocation and the duration. In this way, scheduling is simplified and it minimizes the work for the planner to be performed.

Aram knowledge center

Learn how to create a project, create an interaction between Gantt and time-distance diagrams and how to use TILOS to plan a project.

How to setup a project with TILOS
How to plan a with TILOS by using tasks
How to interact between Gantt and time distance charts

Aram is proud to be the exclusive official reseller of Tilos in the Benelux. We are happy to help

Contact us

Start your trial, book a demo or request more information via Call us 010-2707000 or fill out the contact form and we’ll contact you. Do you need software support? Call us 010-2707017 or open a ticket in the Aram support center.