5000 Tons Crane

5000 Tons Crane

Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) of a 5000 Ton faucet for installation at the Oleg Strashnov.

Aram has prepared the baseline plan for delivering the tap on the Dutch market. Frequent monitors and informing the higher management and interfacing between engineering, procurement and construction. The Aram Advisors have attended weekly progress meetings on the site (Hollandia and Mammoet) to monitor progress and advise on any sub-deliveries of equipment.
Project phase
Project description
Execution
The project included the design, manufacture and turn-key delivery of a 5000-tonne offshore heavy lift crane. The crane was installed on a mono crane by IHC Merwede.
Korte Projectinformatie:
  • Client: Seaway Heavy Lifting (SHL)
  • Period: 2007-2009
  • Tags: planning management, risk management, cost control, project control
  • Sector: Oil & Gas
  • URL: Go to the project website
Relevant Projects

Maintenance Planning Offshore Olie & Gas Production Platforms

Plans of preventive maintenance and shutdowns to the plants on the oil and gas offshore production platforms

Maintenance Scheduling BP Oil Refinery

Planning management of the preventive maintenance at the refinery plants.

FPSO Cidade de Paraty

EPCIC (Engineering, Procurement, Construction, Installation and Commissioning) of FPSO Cidade de Paraty

TurkStream

Construction of a gas pipeline from Russia to Turkey through the Black Sea.

5000 Tons Crane

Engineering, Procurement, Construction, Installation and Commissioning of a 5000 Ton faucet for installation at the Oleg Strashnov

Flash Gas Compressor Barges

Engineering, Procurement and Construction of 3 Flash Gas Compressor Barges